Sign In | Join Free | My xuijs.com
China cangzhou tuoming machine co.,ltd logo
cangzhou tuoming machine co.,ltd
cangzhou tuoming machine co.,ltd
Site Member

4 Years

Home > Purlin Roll Forming Machine >

Manual PLC PPGI Steel Coil Decoiler Machine

cangzhou tuoming machine co.,ltd

Manual PLC PPGI Steel Coil Decoiler Machine

Model Number : U channel

Certification : ce

Place of Origin : china

MOQ : 1

Price : Negotiate

Payment Terms : T/T

Supply Ability : 50

Delivery Time : 30 days

Packaging Details : main machine package with film and the plc and part package with plastic

Weight : 6.5T

Warranty : 1 Year

Type : Steel Frame & Purlin Machine

After-sales service provided : Engineers available to service machinery overseas

Dimension(l*w*h) : 7500*1700*1600Mm

Production capacity : 10-25 m/min

Use : C&Z

Control system : PLC(imported Brand)

Name : Purlin Roll Forming Machine

Product name : hot selling steel z c u purlin cold roll forming machine

Applicable industries : Building Material Shops

Contact Now

3 In 1 U Channel Roll Forming Machine


U channel roll forming machine product by steel coil use for constructure for steel house or warehouse. we can do as your requirements

such as your voltage or your U panel size or machine colour .we can provide design drawing and help you assembly oversea.


Profile



Specification

No. item
1 Machine use Roof sheet roll forming machine
2 Material coil Galvalume ,galvanized, aluminum,PPGI,colour steel
3 Coil thickness 20-30 gauge, 0.3mm-1.0mm
4 Machine dimention(L*W*H) 6000mm*800mm*1000mm
5 Voltage 240v/380v/415v ( can be do s yours)
6 Roller steps 16 steps
7 Roller material 45# steel with quenching
8 Working speed 15-20 meter/min
9 Product capacity 1.5-2.5 tons/hour
10 Machine weight 2500KG
11 Control system Panasonic PLC or siemens plc ( can be cutomized)
12 Drive motor power 4kw
13 Cutting mode Automatic Hydraulic cutting
14 Cutting accuracy ±1mm
15 Control computer language English (can be customized )


The product line working process:

Decoiler feeding roll forming cutting received

Components and Technical Specificatons

(1) Manual decoiler It is used to support the steel coil and make the coil run to rotatory to realized the material sending. The decolier will be rotatory with the main roll forming machine. The capacity of this decoiler is 4000kg, the decoiler can support 508mm inner bore.

(2) Main roll forming machine The main roll forming machine is the most importent process for producting roof sheet .Our rollers adopt 45# steel ,the rollers will be polishing after lathe.Then need to electroplate so make the rollers more lustre and smooth.

(3) Feeding table Put People can put the raw material through the feeding table then go inside the roller to manufactuer and process.the feeding table can guarantee the material run in line and protect it from scratch.

(4) Hydraulic cutting system and cutting moulding
The hydraulic station power is 4kw ,hydraulic oil is 46# , cutting moulding is Cr12.

(5) Control computer box The The computer can make the machine working as your target pieces and length. All data can be adjusted by digit of it. The transducer of the computer can adjust the product speed and also can keep the caccuracy less than 1mm.

(6) Out table This part be welded by angle steel bar and square tube,it have the function of transport or support the products .It can collect products after finished working.

(7) Machine package and loading Main roll forming machine will be nude, the electric part or spare parts will be cover by film or be package by wood box,Common the machine need loading 20 GP or 40 GP container according to its volume.

Warranty&service

1. we provide 24 months’ guarantee . the guarantee against malfunctions duo to the manufactuering defeats or quality problem.
2. Repairs will not be performed even during the guarantee period in the follow conditions

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

Payment terms

40% advance payment by T/T
60% balance be paid before shipping T/T
Delivery

We can do FOB &CIF price

FOB form Tianjin port

CIF to destination port

The delivery time :

25-35 days after we receive your advance payment.
Shipping time:

If everything goes well, common the shipping time is 30-50 days, but different destination different transport time


Product Tags:

plc steel coil decoiler

      

ppgi steel coil decoiler

      

plc manual decoiler machine

      
Best Manual PLC PPGI Steel Coil Decoiler Machine wholesale

Manual PLC PPGI Steel Coil Decoiler Machine Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: cangzhou tuoming machine co.,ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0